Risk register¶
Potentially dangerous operations on a running Kolla-Ansible 2025.1 platform: their impact and the precautions to take before running them. Ratings are relative to a production cloud with running VMs. The risk IDs are those of the earlier studies; each entry says whether the risk still applies to 2025.1, with the code that shows it. R31 to R33 are new in this study.
Note
Key answers
- 33 risks (R1–R33), each with what actually happens, its blast radius, VM and API impact, likelihood, severity, precautions and evidence (Matrix).
- Rated Critical: R7 (
openvswitch_vswitchdrestart or recreate), R12 (changing the image tag and runningdeployinstead ofupgrade), R14 (bootstrap-serversre-run on a live host), R15 (kolla-ansible stop), R16 (kolla-ansible destroy) and, new, R31 (kolla-ansible migrate-container-engine). - Computes and VMs: R1. Changed in 2025.1: a config change touching nova-compute restarts
nova_computeonly, on every affected compute, all at once with the default serial 0;nova_libvirtrestarts only when its own files, image or container definition change, as on the first 2025.1 run (R26). Whether live migrations in flight fail and whether running VMs keep running are NOT AVAILABLE. - Network data plane: R6 (with
enable_neutron_agent_ha: yes, the L3 agent wrapper runsneutron-netns-cleanup --force --agent-type l3before the agent starts), R7 and, new, R33 (the OVN chassis move to the Southbound relays); whether VM traffic is interrupted is NOT AVAILABLE. - New in 2025.1:
migrate-container-engine(R31);reconfigureandupgradecannot be batched withkolla_serial(R32, F19); the OVN Southbound relays are on by default (R33). - Changed in 2025.1: loop-notify is gone, so R1, R5 and R13 restart fewer containers; a
tagged service run no longer restarts HAProxy (R8, R29, F18);
ProxySQL carries the database traffic by default (R8, R9); the first 2025.1 run restarts or
recreates containers for a new unit text and new default ulimits (R26); quorum queues are the only choice
(R27); RabbitMQ moves to 4.0 and the CLI has no
rabbitmq-upgrade(R10, R28); Swift is removed (R21); the Octavia jobboard accepts Valkey (R30);destroykeeps the inventories by their absolute paths (R16). R24 still does not hold as written and R25 still does not apply. - Likelihood × severity at a glance: the heat map.
- Likelihood = how likely the operation is to cause the impact when the triggering condition is present.
- Severity = worst realistic outcome.
- Evidence cites the 2025.1 source lines, or the study section that cites them. Nothing was run. NOT AVAILABLE marks outcomes that the sources do not establish; they are left for the community to confirm.
Matrix¶
| # | Risk | Likelihood | Severity |
|---|---|---|---|
| R1 | Config change touching nova-compute | High | Medium–High |
| R2 | Enabling or disabling a service with a logrotate or fluentd entry | High | Medium |
| R3 | Changing RabbitMQ membership, password or port | Certain | High |
| R4 | Changing memcached membership | Certain | High |
| R5 | ml2_conf.ini override meant for neutron-server |
Certain (neutron-server hosts only) | Medium |
| R6 | neutron_l3_agent restart with enable_neutron_agent_ha: yes |
Certain (if HA flag) | High |
| R7 | openvswitch_vswitchd restart or recreate |
Certain on image change | Critical |
| R8 | HAProxy, ProxySQL or keepalived config change | Certain if changed | High |
| R9 | MariaDB config change or image change | Certain if changed | High |
| R10 | RabbitMQ image change (upgrade) |
Certain on upgrade | Medium–High |
| R11 | kolla-ansible pull |
– | Low (bandwidth) |
| R12 | Image tag change run with deploy instead of upgrade |
Certain | Critical |
| R13 | Rebuilt image under the same tag, then deploy/reconfigure without pull |
– | Medium (drift) |
| R14 | bootstrap-servers re-run on a live host |
Medium | Critical |
| R15 | kolla-ansible stop |
Certain | Critical |
| R16 | kolla-ansible destroy |
Certain | Critical |
| R17 | prune-images |
Low | Low |
| R18 | mariadb-recovery |
Certain | High |
| R19 | Keystone reconfigure |
Certain if changed | Medium–High |
| R20 | Glance reconfigure / deploy | Certain | Medium |
| R21 | Changing the Glance backend on a running cloud (Swift removed) | High | High |
| R22 | Inventory reordering | Medium | High |
| R23 | Any run with --limit on a large inventory |
Certain | Low (time), Medium (drift) |
| R24 | Effective container stop timeout is 10 s (60 s since 2023.1) | Certain | Medium |
| R25 | -t common believed to reconfigure fluentd/cron |
Does not apply in 2025.1 | – |
| R26 | First 2025.1 run on containers that the 2025.1 code has not touched | Certain (such containers) | High |
| R27 | Quorum queues only, on a cloud with classic queues | Certain (2024.1 defaults) | High |
| R28 | RabbitMQ version step refused by the version check | Low on the default images; Certain after a move to 4.1 | High |
| R29 | HAProxy frontend change written by genconfig or a tagged run |
High | Medium (drift) |
| R30 | Octavia with the amphora provider and no Redis or Valkey | Certain (default) | Medium |
| R31 | kolla-ansible migrate-container-engine (new) |
Certain | Critical |
| R32 | reconfigure or upgrade expected to honour kolla_serial (new) |
High | High |
| R33 | First 2025.1 run with OVN: chassis move to the Southbound relays (new) | Certain (OVN) | Medium–High |
R1 — Config change touching nova-compute¶
Still applies to 2025.1, with a smaller reach CODE: loop-notify is gone (Tags §2.4, F1), so only the container whose check reports a change restarts.
| Operation / trigger | Any config change touching nova-compute (override, global flag, password, RabbitMQ list, the messaging options of R27) followed by deploy/reconfigure with a nova tag or no tag |
| What actually happens | nova_compute restarts on every affected compute, all at once (serial 0; reconfigure cannot be batched, R32). The config tasks notify nothing; service-check-containers compares every nova-cell container in one loop and then notifies Restart <key> container for the changed ones only, so nova_libvirt and nova_ssh restart only when their own files, image or container definition changed. They do on the first 2025.1 run (R26). nova_libvirt is a container only when enable_nova_libvirt_container is true, the default for nova_compute_virt_type kvm/qemu |
| Blast radius | all computes |
| VM impact | none from the libvirt side when only nova_compute restarts; when nova_libvirt restarts (retried up to 5 times: "when guests running, nova_libvirt will raise error even though it is removed"), NOT AVAILABLE whether live migrations in flight fail and whether running VMs keep running |
| API impact | nova-compute restarts on each host; NOT AVAILABLE how long it is down |
| Likelihood | High |
| Severity | Medium–High (High when nova_libvirt restarts too) |
| Precautions | genconfig + diff, then deploy-containers --limit in batches, or deploy -e kolla_serial=<n> (not reconfigure, R32); drain live migrations first; before a change that also reaches nova_libvirt, plan as R26 |
| Evidence | roles/; roles/ (one compare loop, then a notify built from the changed items, :34-41); roles/; roles/; roles/ (libvirt restart and retries), :143-158 (nova-compute); group_vars/; nova.yml:125-147 (serial at :140); kolla_ansible/; ansible-core 2.18.20 lib/ (serial 0 = one batch); Tags §2.4; Nova deep dive §5 |
R2 — Enabling or disabling a service with a logrotate or fluentd entry¶
Still applies to 2025.1 CODE: common is its own play, tagged common only, on the cron, fluentd,
kolla-logs and kolla-toolbox groups. Changed in 2025.1: loop-notify is gone, so a fluentd-only change restarts
fluentd alone, and the common config step no longer pulls the fluentd image.
| Operation / trigger | Enabling or disabling a service that has a fluentd input entry (fluentd_input_openstack_services, e.g. barbican) or a logrotate entry (enable_X for most services) in globals.yml, then running the common play (an untagged run, or -t common) |
| What actually happens | fluentd.conf (its 00-global input lists the enabled OpenStack services; td-agent.conf in 2024.1) and logrotate.conf render differently on every host of the common play; the shared check then finds fluentd and cron changed and restarts those two. kolla_toolbox restarts only if its own files changed. With the multinode inventory these are the control, network, compute, storage and monitoring hosts. A tagged service run (-t nova) does not run the common play: the files keep the old content until a later untagged or -t common run. Nova/Cinder/Glance configs gain sections (e.g. [barbican]), so those services restart when their play runs. New in 2025.1: enable_valkey adds a fluentd input, and a uWSGI input lists the services that run under uWSGI |
| Blast radius | fleet-wide (untagged run or -t common); none for fluentd/cron on a tagged service run |
| VM impact | fluentd and cron are none of the containers that Tags §3.1 traces to running VMs CODE; NOT AVAILABLE whether their restart affects VMs another way (Apply common changes (fluentd, cron, kolla_toolbox) §3); Nova restarts as R1 |
| API impact | the services whose configs changed restart (stop with the docker_graceful_timeout of 60 s, then start; R24); NOT AVAILABLE how long their APIs are unavailable, and for how long logs are not collected while fluentd restarts |
| Likelihood | High |
| Severity | Medium |
| Precautions | Treat enable_* changes as fleet-wide changes. Roll out with --limit batches or deploy -e kolla_serial=N (R32); apply the common side deliberately with -t common |
| Evidence | site.yml:88-103 (Apply role common, hosts cron/fluentd/kolla-logs/kolla-toolbox, serial at :95, tags: common); inventory/; roles/ (fluentd.conf), :171-237 (logrotate.conf), roles/ (fluentd service list), roles/, roles/; roles/; roles/; Apply common changes §3 |
R3 — Changing RabbitMQ membership, password or port¶
Still applies to 2025.1 CODE.
| Operation / trigger | Changing RabbitMQ group membership (adding/removing a controller), RabbitMQ password or port |
| What actually happens | rpc_transport_url and notify_transport_url (one entry per host of the rabbitmq group, with user, password and port) change in every messaging service on every host, so every container that renders them restarts: nova, neutron and the compute-side agents included. Update cell rewrites the cell's MQ URL when it differs. Changed in 2025.1: only the containers whose files changed restart, but every messaging container renders the URL, so the reach is the same |
| Blast radius | all hosts |
| VM impact | nova_compute and neutron agent restarts; NOT AVAILABLE their effect on flows |
| API impact | yes |
| Likelihood | Certain |
| Severity | High |
| Precautions | Plan as a maintenance; batch with --limit or deploy -e kolla_serial=N (R32); verify RabbitMQ cluster health first |
| Evidence | group_vars/; roles/, roles/; roles/; roles/ |
R4 — Changing memcached membership¶
Still applies to 2025.1 CODE; 26 roles loop over the list (swift is gone); a 27th, telegraf, names the group only
to test whether its own host runs memcached (roles/telegraf/templates/telegraf.conf.j2:54-57).
| Operation / trigger | Changing memcached membership |
| What actually happens | 26 roles loop over groups['memcached'] in their templates or defaults (grep of groups['memcached'] in roles/ and roles/ gives 27 roles, telegraf only testing its own host: aodh, barbican, blazar, ceilometer, cinder, cloudkitty, cyborg, designate, glance, gnocchi, heat, horizon, ironic, keystone, magnum, manila, masakari, mistral, neutron, nova, octavia, placement, tacker, telegraf, venus, watcher, zun), so their services restart when their plays run; NOT AVAILABLE whether cached tokens are lost. Not only the control plane: neutron.conf is rendered for every neutron agent, so neutron_openvswitch_agent restarts on every compute and network node, and the dhcp, l3 and metadata agents, which get the same file, restart on network nodes; cinder.conf reaches every cinder service (cinder-volume/backup included) and ceilometer.conf every ceilometer service (ceilometer-compute included). Compute nova.conf (nova-cell) has no memcached list |
| Blast radius | controllers + network nodes + all computes (+ storage) |
| VM impact | OVS agent restart; NOT AVAILABLE its effect on flows, and whether router/DHCP traffic is interrupted on network nodes; with enable_neutron_agent_ha, the R6 netns cleanup |
| API impact | memcached server list changes; NOT AVAILABLE effect on auth latency and Horizon sessions |
| Likelihood | Certain |
| Severity | High |
| Precautions | Plan as a dataplane change, like R3: batch with --limit or deploy -e kolla_serial=N, network nodes one at a time; low-traffic window |
| Evidence | fact sheet B §3.9 item 2; Memcached; roles/, roles/; roles/, roles/; roles/, roles/ |
R5 — ml2_conf.ini override meant for neutron-server¶
Still applies to 2025.1, narrower CODE: ml2_conf.ini is rendered only for neutron-server and
neutron-infoblox-ipam-agent, openvswitch_agent.ini has its own template and override files
(F11), and, new in 2025.1, an agent sharing the host is no longer restarted by
loop-notify.
| Operation / trigger | /etc/ override (meant for neutron-server) |
| What actually happens | neutron_server (and neutron_infoblox_ipam_agent if enabled) restarts. Changed in 2025.1: on a host that also runs neutron agents, the agents keep running, since their files did not change. The OVS agent override is neutron/ |
| Blast radius | neutron-server hosts |
| VM impact | none |
| API impact | neutron-server restart |
| Likelihood | Certain (neutron-server hosts only) |
| Severity | Medium |
| Precautions | Put server-only options in neutron/ or neutron/; agent options in neutron/; check the rendered diff |
| Evidence | roles/ (ml2_conf.ini), :152-164 (openvswitch_agent.ini), roles/; roles/; Reconfigure Neutron |
R6 — neutron_l3_agent restart with enable_neutron_agent_ha: yes¶
Still applies to 2025.1 CODE; neutron_l3_agent_failover_delay (default 0) can stagger the restarts
(F12). New in 2025.1, neutron_agents_wrappers runs keepalived, haproxy and dnsmasq
in child containers (Neutron).
| Operation / trigger | Any restart of neutron_l3_agent with enable_neutron_agent_ha: yes (default no) |
| What actually happens | the wrapper runs neutron-netns-cleanup --force --agent-type l3 before the agent starts (the wrapper's comment: "Remove all l3 related netns in case of multiple active routers in l3 high available mode"), then neutron-l3-agent starts CODE. The handler first starts stopped agents, then restarts running agents in a loop over the hosts with a running L3 agent, pausing neutron_l3_agent_failover_delay seconds between items (default 0: no spacing) CODE. NOT AVAILABLE What the command deletes: it is neutron code, which is not in these sources (F12) |
| Blast radius | network nodes (and computes with enable_neutron_dvr) |
| VM impact | NOT AVAILABLE whether north-south and floating-IP traffic of the routers on that node stops, whether and when neutron-l3-agent rebuilds the namespaces, and whether HA routers fail over |
| API impact | none |
| Likelihood | Certain (if HA flag) |
| Severity | High |
| Precautions | Restart network nodes one at a time; fail routers over first; set neutron_l3_agent_failover_delay to space the restarts |
| Evidence | roles/; group_vars/; roles/ (delay at :106, :133), roles/, :626 |
R7 — openvswitch_vswitchd restart or recreate¶
Still applies to 2025.1 CODE. Changed in 2025.1: both containers run the daemon directly under kolla's
ovs_wrapper, whose stop path does not reach the daemon (F22), and an
openvswitch_db-only change no longer restarts vswitchd.
| Operation / trigger | openvswitch_vswitchd restart or recreate: image change, change of its command or container definition, -t openvswitch with a changed image, the first 2025.1 run on a container that the 2025.1 code has not touched (R26), or a change reported by the post-config step (system-id, hostname, hw-offload) |
| What actually happens | ovs-vswitchd (the userspace daemon) restarts. The image only runs modprobe openvswitch (the kernel module is loaded, never unloaded or reloaded), and the command starts ovs-vswitchd with no flow save/restore. Bridges and ports persist in conf.db on the openvswitch_db volume; the db image creates conf.db if absent and runs ovsdb-tool convert when a conversion is needed. On stop, ovs_wrapper builds a wrong control path, so the daemon ends when the container's processes are killed (F22). NOT AVAILABLE Whether the OpenFlow tables held by the old daemon are lost, and whether neutron-openvswitch-agent (or ovn-controller with OVN) reprograms them |
| Blast radius | per host (all OVS hosts at once with serial 0) |
| VM impact | NOT AVAILABLE whether all VM network traffic on the host is interrupted until flows are restored, and for how long |
| API impact | none |
| Likelihood | Certain on image change |
| Severity | Critical |
| Precautions | Upgrade or recreate OVS host by host (--limit) with evacuation or acceptance; never fleet-wide with serial 0 |
| Evidence | roles/ (a db restart does not notify vswitchd, :14-15), roles/, roles/, roles/; roles/; kolla docker/, docker/, docker/; Open vSwitch; Kolla images §5 |
R8 — HAProxy, ProxySQL or keepalived config change¶
Still applies to 2025.1, with the staged restart CODE: the loadbalancer handlers restart the backups before the
node that holds the VIP. Changed in 2025.1: ProxySQL is on by default and carries the database traffic, and its
container is staged with HAProxy; a tagged service run (-t keystone) rewrites the service frontend but no longer
restarts HAProxy (F18, R29).
| Operation / trigger | HAProxy, ProxySQL or keepalived config change applied by a run that includes the loadbalancer play's final check (-t haproxy, -t loadbalancer, -t keepalived or no tag): any service frontend, certs, haproxy.cfg, ProxySQL users or backends; also the first 2025.1 run on a 2024.1 cloud: new unit text (R26), new TLS settings, haproxy_run.sh and layer-7 checks |
| What actually happens | the containers are stopped and started (never reloaded). The handlers first find which host holds kolla_internal_vip_address; every backup host stops and restarts its changed containers (all backups at once) and waits for haproxy_monitor_port and the ProxySQL admin port; then the VIP holder does the same. On a haproxy-only change keepalived is not stopped, so the VIP stays on a node whose haproxy is down until it is back. Every stop and start handler is skipped under kolla_action config (R29). Last, Restart haproxy-ssh container (Let's Encrypt only) runs on every host at once. NOT AVAILABLE Whether the keepalived track script moves the VIP during the master restart, and for how long the APIs and the database are unreachable |
| Blast radius | all APIs; all DB traffic when ProxySQL restarts (enable_proxysql defaults to yes, and ProxySQL then serves database_address) |
| VM impact | none directly; NOT AVAILABLE whether nova/neutron get DB errors while ProxySQL restarts |
| API impact | yes |
| Likelihood | Certain if changed |
| Severity | High |
| Precautions | --skip-tags haproxy when you don't intend to change frontends; apply a frontend change deliberately with -t haproxy in a window; batch with --limit (one loadbalancer host at a time) |
| Evidence | roles/ (VIP lookup), :54-68,90-118 (backup haproxy), :70-88,121-153 (backup proxysql), :181-195, (master haproxy), :197-210 (master proxysql), :212-224 (master keepalived only on Restart keepalived container), :333-347 (haproxy-ssh); site.yml:105-328 (final check at :319-324); roles/; group_vars/; roles/; HAProxy and keepalived; fact sheet A §1.8 |
R9 — MariaDB config change or image change¶
Still applies to 2025.1 CODE: the handlers only group hosts; the restart is a separate play with serial: "33%".
Changed in 2025.1: with ProxySQL by default, mariadb_clustercheck is off, and the first 2025.1 run changes
galera.cnf and the container command.
| Operation / trigger | MariaDB config change or image change; the first 2025.1 run on a 2024.1 cloud (R26) |
| What actually happens | restart mariadb puts running nodes in group mariadb_restart and new nodes in mariadb_start. The Restart mariadb services play then restarts them in batches of int(33% × hosts) or at least 1 (one node at a time for 3 nodes); each node waits for its port and for WSREP Synced. If every host of a batch fails, ansible-core stops the playbook, so later batches are not restarted. ProxySQL gives one writer per shard, weight 100 for the first host of the shard; in HAProxy mode the single active backend is the first host of the default shard. NOT AVAILABLE In which order group_by places the hosts, hence whether the writer restarts first |
| Blast radius | DB cluster |
| VM impact | none directly |
| API impact | DB connection resets |
| Likelihood | Certain if changed |
| Severity | High |
| Precautions | Check wsrep_cluster_size and Synced on all nodes before; take a backup (mariadb-backup); watch between batches |
| Evidence | roles/, mariadb.yml:18-34 (serial at :24), roles/, roles/, :132; roles/; ansible-core 2.18.20 lib/ (percentage → int(...) or 1), lib/ (a fully failed batch ends the playbook); MariaDB; fact sheet B §1.8 |
R10 — RabbitMQ image change (upgrade)¶
Still applies to 2025.1, with the rolling restart CODE: upgrade does not stop all brokers; it restarts them in
serial: "33%" batches, draining each one first. Changed in 2025.1: the default image moves from RabbitMQ 3.13 to
4.0, upgrade enables every stable feature flag first, and the CLI has no rabbitmq-upgrade command.
| Operation / trigger | RabbitMQ image change (upgrade), including the 2024.1 → 2025.1 step from 3.13 to 4.0, or a move to the rabbitmq-4-1 image with upgrade -t rabbitmq |
| What actually happens | upgrade.yml runs version-check (R28), remove-ha-all-policy, config, feature-flags (every stable feature flag enabled on the running brokers) and check-containers; the restart handler only adds the host to rabbitmq_restart. The Restart rabbitmq services play then, per batch of int(33% × hosts) or at least 1, puts the node into maintenance mode (drain), recreates the container and waits. NOT AVAILABLE whether clients reconnect without errors while a broker is drained, and what RabbitMQ 4.0 does with a mixed-version cluster during the roll |
| Blast radius | all RPC |
| VM impact | NOT AVAILABLE whether nova-compute heartbeats are lost and services are reported down |
| API impact | NOT AVAILABLE whether API calls fail while a broker restarts |
| Likelihood | Certain on upgrade |
| Severity | Medium–High |
| Precautions | Maintenance window; migrate the queues first (R27); check the running RabbitMQ version first (R28); watch for agent and compute services reported down |
| Evidence | roles/, roles/, roles/, roles/, rabbitmq.yml:30-49, roles/; roles/; kolla docker/; setup.cfg:50-77 (no rabbitmq-upgrade); RabbitMQ; fact sheet B §2.8 |
R11 — kolla-ansible pull¶
Still applies to 2025.1 CODE; the pull goes to Docker or Podman per kolla_container_engine.
| Operation / trigger | kolla-ansible pull |
| What actually happens | downloads images on every host: one pull_image per enabled container mapped to the host (retried service_images_pull_retries times, default 3). New in 2025.1: with ProxySQL on by default, network nodes that run the loadbalancer also pull the proxysql image (Update container images) |
| Blast radius | registry + network |
| VM impact | none |
| API impact | none |
| Likelihood | – |
| Severity | Low (bandwidth) |
| Precautions | Run ahead of maintenance; limit parallelism with ANSIBLE_FORKS or forks in ansible.cfg (the 2025.1 CLI has no --forks option); local registry mirror |
| Evidence | roles/, roles/; module_utils/; module_utils/; library/ (engine dispatch) |
R12 — Image tag change run with deploy instead of upgrade¶
Still applies to 2025.1 CODE. On a cloud deployed by 2024.1, the new openstack_release default makes every
deploy of a role that the upgrade has not reached yet such a tag change
(Predict and inspect a run §2).
| Operation / trigger | Changing openstack_release, openstack_tag or a *_tag and running deploy (or reconfigure, deploy-containers) instead of upgrade |
| What actually happens | every container is recreated (fleet-wide); upgrade-specific steps (the Nova reload plays and the online data migrations, except Placement's, which run inside bootstrap_placement) do not run. Neutron: instead of the rolling expand → restart → contract (default neutron_enable_rolling_upgrade: yes), bootstrap_neutron runs neutron-db-manage … upgrade head for neutron and each enabled subproject with the new image before the handlers restart the old neutron_server containers; NOT AVAILABLE whether upgrade head applies the expand and contract branches together, which would run contract migrations under live old-version servers |
| Blast radius | fleet-wide |
| VM impact | as R1 + R7 + R8 together |
| API impact | yes |
| Likelihood | Certain |
| Severity | Critical |
| Precautions | Use pull then upgrade (the 2025.1 docs also recommend prechecks before it); per-service tags or --limit batches (upgrade ignores kolla_serial, R32) |
| Evidence | group_vars/; module_utils/, module_utils/ (new image → recreate); nova.yml:180-302 (reload and online-migration plays, kolla_action == 'upgrade' only); roles/, roles/, roles/, roles/, roles/; kolla docker/, docker/; Kolla images §4; F15 |
R13 — Rebuilt image under the same tag, then deploy/reconfigure without pull¶
Still applies to 2025.1 CODE, with Docker and with Podman (F4).
| Operation / trigger | Rebuilt image pushed under the same tag, then deploy/reconfigure without pull |
| What actually happens | nothing changes (only absent images are pulled; the comparison uses the local image of that tag). After pull: the containers of that image are recreated, and, changed in 2025.1, only those |
| Blast radius | – / the containers of the rebuilt image |
| VM impact | as R1 for a nova-compute image, R7 for an Open vSwitch image |
| API impact | – |
| Likelihood | – |
| Severity | Medium (drift) |
| Precautions | Use immutable tags; always pull deliberately |
| Evidence | module_utils/ (local image lookup), :107-122 (image id compare), :352-383 (pull only if absent); module_utils/, :609-629; F4 |
R14 — bootstrap-servers re-run on a live host¶
Still applies to 2025.1 CODE; the work comes from ansible-collection-kolla. Changed in 2025.1: the Docker
handlers are flushed right after the daemon.json write, the role reads docker system info, and on hosts that use
the containerd image store it rewrites /etc/containerd/config.toml and restarts containerd.
| Operation / trigger | bootstrap-servers re-run on a live host; also the CI pattern of re-running it before an upgrade to bring the Python libraries to the new versions |
| What actually happens | with Docker, can restart the Docker daemon (if daemon.json or the registry CA changes; docker_systemd_reload: false by default, so the handler restarts rather than reloads), now right after the daemon.json write, on every notified host of the batch at once → NOT AVAILABLE whether every container on the host stops and how the kolla-<name>-container.service units bring them back. With the containerd image store, containerd restarts too. Also disables firewalld/ufw (disable_firewall: true), sets SELinux permissive, and removes host packages: on Debian/Ubuntu lxd, lxc, open-iscsi and, with the libvirt container, libvirt-bin; on RedHat, with the libvirt container, libvirt, libvirt-daemon, iscsi-initiator-utils. The Docker SDK requirement is now docker>=7.0.0 |
| Blast radius | per host / fleet (all hosts at once by default) |
| VM impact | a Docker restart affects nova_libvirt and OVS → see R1/R7 |
| API impact | yes |
| Likelihood | Medium |
| Severity | Critical |
| Precautions | Run only with --limit on new hosts, or -e kolla_serial=1 (the command passes no serial of its own); diff daemon.json first; check whether the host uses the containerd image store |
| Evidence | kolla-host.yml:4-14; kolla_ansible/; ansible-collection-kolla roles/, roles/, roles/, roles/, roles/, roles/ (flush at :55), :57-63 (docker system info), :69-87 (containerd), roles/, roles/, roles/; tests/; fact sheet E §0 items 1 and 7 |
R15 — kolla-ansible stop¶
Still applies to 2025.1 CODE. New in 2025.1: --ignore-missing skips containers that do not exist.
| Operation / trigger | kolla-ansible stop --yes-i-really-really-mean-it |
| What actually happens | stops all Kolla containers (incl. nova_libvirt, OVS, MariaDB) on targeted hosts, except those named in skip_stop_containers; each stop goes through the container's systemd unit when it exists, and the unit stays enabled |
| Blast radius | targeted hosts |
| VM impact | nova_libvirt and OVS containers stopped; NOT AVAILABLE whether VM network traffic stops (see R7) |
| API impact | yes |
| Likelihood | Certain |
| Severity | Critical |
| Precautions | Use --limit + tags + skip_stop_containers; MariaDB then needs mariadb-recovery |
| Evidence | kolla_ansible/; roles/; module_utils/; Stop and destroy; fact sheet B §1.8 |
R16 — kolla-ansible destroy¶
Still applies to 2025.1 CODE. Changed in 2025.1: the inventories kept under /etc/kolla are Ansible's
absolute ansible_inventory_sources, so an inventory in a subdirectory of /etc/kolla is removed.
| Operation / trigger | kolla-ansible destroy --yes-i-really-really-mean-it |
| What actually happens | disables, stops and removes containers and their kolla-*-container.service units, volumes, /etc/kolla/* (except passwords.yml, globals.yml, globals.d, kolla-build.conf, config, certificates and the entries equal to an inventory path), all network namespaces and tap/brq/vxlan links (tools/). tools/ stops before anything when qemu processes run next to nova_libvirt |
| Blast radius | targeted hosts incl. deploy host (hosts: all) |
| VM impact | total |
| API impact | total |
| Likelihood | Certain |
| Severity | Critical |
| Precautions | Never on production; there is no --limit safety net beyond what you pass |
| Evidence | destroy.yml:2-9; kolla_ansible/; roles/, roles/; tools/, :43-67, tools/, :65-97; Stop and destroy; fact sheet E §6 |
R17 — prune-images¶
Still applies to 2025.1 CODE; the playbook and role are unchanged from 2024.1.
| Operation / trigger | prune-images --yes-i-really-really-mean-it |
| What actually happens | with Docker, runs docker_prune with images: yes and the filter label: kolla_version on the baremetal hosts; with Podman, podman image prune --force --filter 'label=kolla_version'. NOT AVAILABLE Whether only dangling images are removed: that is the behaviour of the docker_prune module (community.docker) and of Podman, neither of which is in these sources |
| Blast radius | per host |
| VM impact | none |
| API impact | none |
| Likelihood | Low |
| Severity | Low |
| Precautions | – |
| Evidence | kolla_ansible/; prune-images.yml:1-13; roles/; fact sheet E §7 |
R18 — mariadb-recovery¶
Still applies to 2025.1 CODE; the command is now mariadb-recovery, with a hyphen.
| Operation / trigger | kolla-ansible mariadb-recovery |
| What actually happens | unless mariadb_recover_inventory_name is given, stops every MariaDB node, even healthy ones, runs a wsrep recovery container on each, and bootstraps from the host with the highest seqno |
| Blast radius | DB cluster |
| VM impact | none directly |
| API impact | full DB outage |
| Likelihood | Certain |
| Severity | High |
| Precautions | Only when the cluster is fully down; identify the node with the highest seqno manually first |
| Evidence | kolla_ansible/; setup.cfg:72-73; mariadb_recovery.yml:12-13; roles/, :98-100; Database operations; fact sheet B §1.8 |
R19 — Keystone reconfigure¶
Still applies to 2025.1 CODE.
| Operation / trigger | Keystone reconfigure (any keystone change, including memcached/RabbitMQ membership) |
| What actually happens | the changed keystone containers restart in the handler order keystone_ssh, keystone_fernet, keystone, each on all keystone hosts at once (serial 0, which reconfigure always uses, R32); Fernet keys are pushed with rsync --delete from the first host where a keystone_fernet container was listed (else the first keystone host), deleting others' keys; the bootstrap container (db sync) runs once. On the first 2025.1 run, the messaging options and the unit text change, so every keystone container restarts |
| Blast radius | identity |
| VM impact | none |
| API impact | NOT AVAILABLE whether authentication fails while keystone restarts |
| Likelihood | Certain if changed |
| Severity | Medium–High |
| Precautions | Batch with deploy -t keystone -e kolla_serial=N; verify Fernet key consistency before and after |
| Evidence | site.yml:498-510; roles/, roles/, roles/, roles/, roles/; Keystone; fact sheet B §3.9 |
R20 — Glance reconfigure / deploy¶
Still applies to 2025.1 CODE.
| Operation / trigger | Glance reconfigure / deploy |
| What actually happens | toggles global MariaDB log_bin_trust_function_creators 1→0 around db sync (unless use_preconfigured_databases); with the file backend on the default named volume (glance_file_datadir_volume: "glance") only the first glance-api host runs glance-api → any restart is a full Image API outage |
| Blast radius | DB + glance |
| VM impact | NOT AVAILABLE whether snapshots in progress fail |
| API impact | Image API outage |
| Likelihood | Certain |
| Severity | Medium |
| Precautions | Avoid during image-heavy operations |
| Evidence | roles/; group_vars/, :1142, :1146, :1321; roles/, :90; Glance; fact sheet C §1 |
R21 — Changing the Glance backend on a running cloud (Swift removed)¶
Still applies to 2025.1, without Swift CODE: the swift role and glance_backend_swift are gone, so a cloud whose
only store was Swift falls back to the file store at its first 2025.1 run, with no check
(Swift).
| Operation / trigger | Setting glance_backend_ceph, glance_backend_s3 or glance_backend_vmware on a running cloud; or upgrading a 2024.1 cloud whose Glance used Swift |
| What actually happens | silently switches Glance's backend: glance_backend_file becomes false as soon as any other backend is on, and true again when none is, which is the case of a former Swift-only cloud. With the file store on the default named volume, only the first glance-api host runs glance-api (R20). NOT AVAILABLE whether existing images of the old store stay readable |
| Blast radius | glance |
| VM impact | NOT AVAILABLE whether boots from existing images fail |
| API impact | yes |
| Likelihood | High |
| Severity | High |
| Precautions | Set glance_backend_* explicitly before the change; before upgrading a cloud that runs Swift, decide where its images go (Swift) |
| Evidence | group_vars/, :1146; roles/; Glance; fact sheet C §1.8 |
R22 — Inventory reordering¶
Still applies to 2025.1 CODE.
| Operation / trigger | Inventory reordering (loadbalancer, mariadb, glance, nova-conductor, keystone groups) |
| What actually happens | keepalived priorities change (priority = position in loadbalancer + 1); the MariaDB preferred writer moves (first host of the shard: weight 100 in ProxySQL, the only active backend in HAProxy mode); glance moves (file backend: first glance-api host); bootstrap/discovery targets (groups[...][0], e.g. cell creation on the first nova-conductor host, Fernet push fallback to the first keystone host, the Fernet rotation schedule of each keystone host) change |
| Blast radius | per group |
| VM impact | indirect |
| API impact | possible |
| Likelihood | Medium |
| Severity | High |
| Precautions | Treat inventory order as configuration; never reorder casually |
| Evidence | roles/; roles/, roles/; group_vars/; roles/, :28; roles/, roles/; fact sheets A §1.8, B §1.8, C §1 |
R23 — Any run with --limit on a large inventory¶
Still applies to 2025.1 CODE (F9); new in 2025.1,
kolla_ansible_delegate_facts_hosts can narrow the hosts whose facts are gathered.
| Operation / trigger | Any run with --limit on a large inventory |
| What actually happens | fact gathering for the hosts of kolla_ansible_delegate_facts_hosts (default every host) is executed sequentially by the limited hosts (delegated loop) → long runtime; cross-host files are not updated on non-limited hosts |
| Blast radius | – |
| VM impact | none |
| API impact | none |
| Likelihood | Certain |
| Severity | Low (time), Medium (drift) |
| Precautions | Enable fact caching (ansible-tuning.rst, section "Fact caching"), or narrow kolla_ansible_delegate_facts_hosts to the hosts whose facts the run needs (section "Delegated fact gathering"); follow up with a full run when cross-host config changed |
| Evidence | gather-facts.yml:34-62 (:47: each limited host loops over its share of kolla_ansible_delegate_facts_hosts), group_vars/; ansible-core 2.18.20 lib/ (loop items run one after another); doc/, :164-203; fact sheet E §4 |
R24 — Effective container stop timeout is 10 s¶
No longer holds as written in 2025.1 CODE, as since 2023.1: containers (except one-shot ones) run under a systemd
unit kolla-<name>-container.service whose ExecStop is /usr/bin/<engine> stop <name> -t <graceful_timeout>
(docker or podman), and graceful_timeout comes from docker_common_options, i.e. docker_graceful_timeout
(60 s). The 10 s value remains only as the module default when no graceful_timeout is passed, which plays using
docker_common_options do not hit (F3).
| Operation / trigger | Any container restart or stop (recreate_or_restart_container, restart_container, stop_container) |
| What actually happens | the restart goes through systemd RestartUnit/StopUnit; <engine> stop -t 60 sends SIGTERM and kills a service still running after 60 s (heat-engine, cinder-volume copies, glance uploads); the module waits up to client_timeout (docker_client_timeout: 120 s) for the unit state and fails with "Container timed out" otherwise. A stop uses the timeout written in the existing unit file; a restart rewrites the unit first. Changing docker_graceful_timeout changes the unit text, so the next check restarts every long-running container whose role runs the check step (R26). NOT AVAILABLE systemd's own stop timeout for these units (the unit sets none, and systemd defaults are not in these sources). NOT AVAILABLE Whether services started by a shell wrapper that does not exec them (e.g. neutron-l3-agent) receive SIGTERM at all, and how the Open vSwitch daemons end under ovs_wrapper (F22, Kolla images §2.6). Changed in 2025.1: haproxy_run.sh now execs HAProxy |
| Blast radius | all restarts |
| VM impact | in-flight operations killed after 60 s |
| API impact | – |
| Likelihood | Certain |
| Severity | Medium |
| Precautions | Drain long operations before restarts; raise docker_graceful_timeout if needed (it reaches the unit on the next restart, and restarts every container whose unit it changes) |
| Evidence | module_utils/ (template, ExecStop at :33), :98-126, :150-186; module_utils/, :426-470; library/; group_vars/; Repository architecture §6; kolla docker/, docker/; roles/ |
R25 — -t common believed to reconfigure fluentd/cron¶
Does not apply to 2025.1 CODE, as since 2023.1: common is the Apply role common play in site.yml, with
play-level tags: common, so -t common runs its tasks on the cron, fluentd, kolla-logs and kolla-toolbox
hosts (F2). There is still no chrony role (the Ussuri workaround -t chrony).
| Operation / trigger | -t common believed to reconfigure fluentd/cron |
| What actually happens | -t common does reconfigure fluentd, cron and kolla_toolbox (config → check-containers → handlers). The reverse surprise exists instead: a tagged service run (e.g. -t nova) does not run the common play, so a fluentd/logrotate change waits for an untagged or -t common run (R2) |
| Blast radius | the common hosts |
| VM impact | – |
| API impact | – |
| Likelihood | Does not apply in 2025.1 |
| Severity | – |
| Precautions | Use -t common to apply fluentd/cron changes; verify with docker exec … kolla_set_configs --check |
| Evidence | site.yml:88-103; roles/; Apply common changes §2; Tags §2.1 |
R26 — First 2025.1 run on containers that the 2025.1 code has not touched¶
Still applies to 2025.1, with new causes CODE (F16): the unit template changed
again, and Docker hosts outside the Red Hat family get default nofile ulimits. In 2024.1 the entry covered the first
2024.1 run on units that 2023.1 wrote.
| Operation / trigger | The first 2025.1 run that checks a container that no 2025.1 run has created, recreated or restarted yet: e.g. a service left out of a tagged or --limit upgrade, then any deploy, reconfigure, deploy-containers or upgrade that reaches its role. Later, any change of docker_graceful_timeout, docker_client_timeout, docker_restart_policy_retry, or of docker_restart_policy to a value that renders differently, has the same effect (unless-stopped and always both render Restart=always) |
| What actually happens | compare_container reports a change when check_unit_change finds that the unit file on disk differs from the rendered template, whole text compared: the 2025.1 template adds PartOf=kolla.target, so every unit that 2024.1 wrote differs. On Docker hosts outside the Red Hat family, default_container_dimensions now sets nofile ulimits, which compare_dimensions compares, so most containers created by 2024.1 are recreated, not only restarted; Podman hosts are not affected by this second cause. The shared check then notifies the restart handler of each such container. A container that the 2025.1 code creates, recreates or restarts gets the new unit then and is not flagged again; one-shot containers have no unit. A service that upgrade has not reached also moves to its 2025.1 image (R12) |
| Blast radius | every host of the run, role by role; on computes nova_libvirt and, through the openvswitch role, openvswitch_vswitchd |
| VM impact | as R1 (with nova_libvirt) and R7 for the containers concerned; NOT AVAILABLE whether running VMs or their traffic are affected |
| API impact | the restarted services; NOT AVAILABLE for how long |
| Likelihood | Certain (such containers) |
| Severity | High |
| Precautions | Before the run, list the units without PartOf=kolla.target and, on Docker, the containers whose ulimits are empty (Predict and inspect a run §2); upgrade every role before any deploy/reconfigure; treat the first run of a role the upgrade did not reach as a restart of that role: per role (-t), in --limit batches or with deploy -e kolla_serial=N (R32), OVS hosts one at a time. Treat a change of the docker_* timeouts or restart policy the same way |
| Evidence | module_utils/ (template, PartOf at :27), :155-168 (check_unit_change: whole text), :173-186 (create_unit_file: write, reload, enable); roles/ (kolla.target); module_utils/ (compare_container), :274-303, :326-336 (ulimits compared); group_vars/; module_utils/, :484-500; module_utils/, :395, :462; roles/; Repository architecture §6; Pre-execution checklist §2 |
R27 — Quorum queues only, on a cloud with classic queues¶
Changed in 2025.1 CODE (F17): the om_enable_rabbitmq_high_availability,
om_enable_rabbitmq_quorum_queues and om_enable_rabbitmq_transient_quorum_queue variables are gone; every service
renders quorum queues, transient quorum queues and, by default, stream fanout.
| Operation / trigger | The first 2025.1 upgrade, deploy or reconfigure on a cloud upgraded from 2024.1; also kolla-ansible prechecks on such a cloud |
| What actually happens | every service template that renders [oslo_messaging_rabbit] (26 templates in 24 roles) now writes use_queue_manager, rabbit_quorum_queue, rabbit_transient_quorum_queue and, while om_enable_rabbitmq_stream_fanout keeps its default, rabbit_stream_fanout: on a cloud that ran the 2024.1 defaults (quorum queues already on) the config still changes, so those services restart when their plays run, computes included, with the reach of R3. When a rabbitmq container exists, prechecks asserts with no switch that every non-reply_, non-fanout queue and every reply_ queue is a quorum queue, and that fanout queues are streams; it fails while classic queues exist, and its message calls the migration manual and says it may take several hours. upgrade, deploy and reconfigure do not run these checks. NOT AVAILABLE What oslo.messaging does with existing classic transient queues when the services restart with the new options |
| Blast radius | all hosts that run a messaging service |
| VM impact | nova_compute and neutron agent restarts; NOT AVAILABLE their effect on VMs |
| API impact | NOT AVAILABLE whether RPC fails while queues are redeclared |
| Likelihood | Certain (2024.1 defaults) |
| Severity | High |
| Precautions | Run prechecks before the upgrade; migrate the remaining classic queues first, as the precheck message asks; then roll the messaging config out like R3. Setting the removed om_enable_rabbitmq_* variables does nothing |
| Evidence | group_vars/; roles/, roles/; roles/ (message at :121-125, tag at :164); site.yml:77-86 (the prechecks play runs only for kolla_action precheck), kolla_ansible/; RabbitMQ |
R28 — RabbitMQ version step refused by the version check¶
Still applies to 2025.1 CODE: deploy, reconfigure and upgrade run the version check. Changed in 2025.1:
the default image moves from RabbitMQ 3.13 to 4.0, a step the check allows; the CLI no longer has rabbitmq-upgrade,
which the failure message still names.
| Operation / trigger | kolla-ansible upgrade (or deploy/reconfigure) while the running RabbitMQ is more than one minor version behind the target image, or newer than it: e.g. a 2024.1 cloud that moved to the rabbitmq-4-1 image (4.1) against the default 2025.1 image (4.0) |
| What actually happens | when a rabbitmq container exists, once on the first host of the group (run_once), the check reads the running version with rabbitmqctl --version and the new one from a one-shot rabbitmq_version_check container of the target image, then asserts the same major version and at most one minor version between them, or the step 3.13 → 4.0/4.1; a second assert refuses a downgrade. Under --check none of this runs: the Get container facts task that gates the block has no check_mode: false, and kolla_container_facts declares no check-mode support, so it is skipped. A failed run_once task fails every host of the play, so the whole batch fails and ansible-core ends the playbook. The RabbitMQ plays come after the common, loadbalancer, Redis, Valkey, MariaDB, memcached and other plays of site.yml, which an untagged run has already applied. NOT AVAILABLE Which version a given cloud runs |
| Blast radius | the run: every play after the RabbitMQ play is not applied |
| VM impact | none directly; NOT AVAILABLE the effect of a cloud left half-upgraded |
| API impact | NOT AVAILABLE |
| Likelihood | Low on the default images; Certain after a move to 4.1 |
| Severity | High |
| Precautions | Before the upgrade, read the running RabbitMQ version (rabbitmqctl --version); a cloud on 4.1 keeps rabbitmq_image on the rabbitmq-4-1 image. Running the upgrade with -t rabbitmq first runs the same check, but before any other play. --skip-tags rabbitmq-version-check skips the check entirely |
| Evidence | roles/, roles/, roles/ (one-shot :13-38, asserts :45-65 and :67-74, message :64, condition :76, run_once and tag :79-80), :3-10 (facts task); library/ (no supports_check_mode); ansible-core 2.18.20 lib/ (such a module is skipped under --check), lib/ (run_once failure marks every host failed), lib/; site.yml:483, :88-481 (earlier plays); roles/; kolla docker/, docker/; setup.cfg:50-77; RabbitMQ |
R29 — HAProxy frontend change written by genconfig or a tagged run¶
Wider in 2025.1 CODE (F18): besides genconfig, any tagged service run now writes
a frontend without restarting HAProxy.
| Operation / trigger | A change that alters a service's HAProxy frontend (port, TLS, external FQDN, single external frontend, health check), written by genconfig (kolla_action=config) or by a run tagged with the service (-t keystone) |
| What actually happens | each service's loadbalancer.yml imports loadbalancer-config with tags: always, so /etc/ is rewritten. The haproxy-config tasks no longer notify; the restart comes only from the final check-containers include of the loadbalancer play, which carries only the play tags (haproxy, keepalived, loadbalancer) and is skipped under config. HAProxy keeps the old frontend until a run with -t haproxy, -t loadbalancer or no tag, whose check compares services.d and restarts HAProxy (staged, R8). On the first 2025.1 run, the new option httpchk lines change most frontends this way |
| Blast radius | the service's API (old frontend) |
| VM impact | none |
| API impact | the old frontend stays live; NOT AVAILABLE whether clients fail against it |
| Likelihood | High |
| Severity | Medium (drift) |
| Precautions | Copy /etc/ before the run and diff after; apply a frontend change deliberately with -t haproxy (staged restart, R8) |
| Evidence | kolla_ansible/; site.yml:105-328 (final check at :319-324); e.g. site.yml:203-207; roles/; roles/; roles/ (kolla_action != "config" at :16-17); roles/; roles/; Predict and inspect a run; Reconfigure a single service |
R30 — Octavia with the amphora provider and no Redis or Valkey¶
Still applies to 2025.1 CODE; changed in 2025.1: the jobboard runs on Valkey or Redis, and upgrade no
longer creates the persistence database.
| Operation / trigger | prechecks, deploy, reconfigure or upgrade with enable_octavia: yes, the default amphora provider, and enable_redis and enable_valkey both left at no |
| What actually happens | enable_octavia_jobboard is on by default with the amphora provider, so octavia.conf gets a [task_flow] section whose jobboard lists the valkey hosts (with enable_valkey) or else the redis hosts, and a persistence_connection to the octavia_persistence database, which deploy and reconfigure create. prechecks fails until Redis or Valkey is enabled; deploy, reconfigure and upgrade do not run that assert and render the section whether or not the Redis or Valkey play runs. The sentinel name is written as kolla, which matches only the default valkey_sentinel_monitor_name. NOT AVAILABLE How Octavia behaves when the jobboard points at hosts with no Redis or Valkey, and whether running flows survive a move from Redis to Valkey |
| Blast radius | Octavia (load balancer create/update) |
| VM impact | NOT AVAILABLE for amphora instances |
| API impact | NOT AVAILABLE |
| Likelihood | Certain (default) |
| Severity | Medium |
| Precautions | Before the upgrade, choose: enable_valkey: yes or enable_redis: yes (deployed by their own plays, before Octavia), or enable_octavia_jobboard: no; make sure passwords.yml has octavia_persistence_database_password; run prechecks |
| Evidence | group_vars/, :959, :965, :751; roles/ (sentinel name at :183); roles/; roles/; site.yml:385-411; Octavia |
R31 — kolla-ansible migrate-container-engine¶
New in 2025.1 CODE.
| Operation / trigger | kolla-ansible migrate-container-engine after changing kolla_container_engine (Docker to Podman or back) |
| What actually happens | on every baremetal host in one play (no serial): fails if the target engine's package is already installed, installs the target engine and SDK, cleans the OVS bridges when Open vSwitch runs, stops every container of the current engine, moves the volumes, removes the RabbitMQ Mnesia tables, removes all containers and images and uninstalls the old engine; then redeploys everything with site.yml (kolla_action: deploy) and runs post-deploy. The CLI asks for no confirmation. NOT AVAILABLE What happens to running guests while nova_libvirt is stopped, and how long the cloud is down |
| Blast radius | the whole cloud |
| VM impact | nova_libvirt and OVS stopped on every compute at once; NOT AVAILABLE the effect on guests |
| API impact | total, until the redeploy ends |
| Likelihood | Certain |
| Severity | Critical |
| Precautions | Treat as a full outage; take a database backup first; there is no batching and no confirmation guard |
| Evidence | kolla_ansible/; migrate-container-engine.yml:1-21; roles/; fact sheet E §6.1; Database operations |
R32 — reconfigure or upgrade expected to honour kolla_serial¶
New in 2025.1 CODE (F19).
| Operation / trigger | kolla-ansible reconfigure or upgrade run with -e kolla_serial=N, or with ANSIBLE_SERIAL set in the environment as in 2024.1, to roll the change host by host |
| What actually happens | ANSIBLE_SERIAL is now a constant 0 in the Python CLI; reconfigure and upgrade put it in their own extra vars as kolla_serial, after the user's -e, and the later value wins. Every play then runs all its hosts in one batch. The environment variable is not read. deploy, which runs the same tasks as reconfigure, passes no serial of its own, so -e kolla_serial=N still batches it |
| Blast radius | every host of each play, at once |
| VM impact | as the restarts of the run (R1, R7) |
| API impact | as the restarts of the run |
| Likelihood | High (procedures written for 2024.1) |
| Severity | High |
| Precautions | Batch with deploy -e kolla_serial=N instead of reconfigure, or with --limit; for upgrade, use per-service tags and --limit |
| Evidence | kolla_ansible/, :134-136, :276-278; fact sheet E §11; Write config first, apply in controlled batches §1.2 |
R33 — First 2025.1 run with OVN: chassis move to the Southbound relays¶
New in 2025.1 CODE.
| Operation / trigger | The first 2025.1 upgrade or deploy on a cloud with enable_ovn: yes that keeps the new default enable_ovn_sb_db_relay |
| What actually happens | the ovn-controller play sets ovn-remote of every chassis to a relay, picked per host, before the ovn-db play has created the relay containers, which start on the ovn-sb-db-relay hosts, one per 50 ovn-controller hosts. The Neutron OVN metadata and OVN agents also move to a relay; ovn-northd, neutron-server and Octavia stay on the Southbound cluster. ovn_controller itself is not restarted by the move. NOT AVAILABLE How long each chassis stays without a Southbound connection, and what that does to the data plane |
| Blast radius | every OVN chassis |
| VM impact | NOT AVAILABLE |
| API impact | NOT AVAILABLE whether port bindings are delayed meanwhile |
| Likelihood | Certain (OVN) |
| Severity | Medium–High |
| Precautions | Decide on the relays before the upgrade; to keep the 2024.1 layout, set enable_ovn_sb_db_relay: no; otherwise plan the first run as a network change |
| Evidence | group_vars/, :640-648; roles/; site.yml:635, :649-663; roles/; OVN |
Heat map (likelihood × severity)¶
quadrantChart
title Risk heat map (relative)
x-axis Low likelihood --> High likelihood
y-axis Low severity --> High severity
quadrant-1 Prevent or control strictly
quadrant-2 Prepare contingency
quadrant-3 Accept
quadrant-4 Standardise procedure
R1 nova compute change: [0.85, 0.6]
R3 RabbitMQ membership: [0.9, 0.8]
R7 OVS restart: [0.6, 0.95]
R8 HAProxy ProxySQL restart: [0.75, 0.7]
R12 tag change via deploy: [0.55, 0.93]
R14 bootstrap servers rerun: [0.4, 0.88]
R16 destroy: [0.05, 0.98]
R11 pull: [0.9, 0.15]
R24 60s stop timeout: [0.95, 0.45]
R26 first run drift: [0.85, 0.72]
R27 quorum only: [0.88, 0.72]
R28 RabbitMQ version gate: [0.25, 0.66]
R29 frontend drift: [0.75, 0.4]
R30 Octavia without Redis or Valkey: [0.65, 0.5]
R31 container engine migration: [0.1, 0.97]
R32 serial ignored: [0.7, 0.75]
R33 OVN relays: [0.8, 0.6]
R25 is left out of the heat map: it does not apply to 2025.1.
Related¶
- Operations — the scenario walk-throughs and the commands
- Pre-execution checklist — what to check before a run
- Technical findings — F16 to F19 behind R26, R27, R29 and R32
- Open questions — the open questions behind the NOT AVAILABLE cells
- Tag index — from a tag to its component page, which lists the risks of the tag
- What a tag really executes — the shared check that replaced loop-notify, and the other tag semantics that the evidence cells cite
- 2024.1 risk register — the same page for 2024.1
To remember
Lumo: if you keep only 5 things from this page, keep these.
- Rated Critical:
openvswitch_vswitchdrestart or recreate (R7), image tag change run withdeployinstead ofupgrade(R12),bootstrap-serversre-run (R14),stop(R15),destroy(R16) and, new in 2025.1,migrate-container-engine(R31). - Changed in 2025.1 (R1): a config change touching nova-compute restarts
nova_computeonly, on every affected compute, all at once with the default serial 0; loop-notify no longer restartsnova_libvirtandnova_sshwith it. CODE - New in 2025.1 (R32):
reconfigureandupgradealways run withkolla_serial=0, whatever you pass with-e; batch withdeploy -e kolla_serial=Nor--limit. CODE - R26 in 2025.1: the unit template gained
PartOf=kolla.targetand Docker hosts outside the Red Hat family get defaultnofileulimits, so the first 2025.1 run restarts or recreates every container that the 2025.1 code has not touched yet. CODE - R27 in 2025.1: quorum queues are the only choice;
prechecksfails while classicreply_or fanout queues remain, and the migration is manual. CODE
What would you do?
Lumo: a situation you could meet on a real platform, and three ways to react. Pick the one you would choose: I will tell you what this page says about it. Nothing is recorded.
Check yourself
Lumo: 4 quick questions to check the main ideas of this page. Choose an answer to see the explanation and the section that gives the evidence. Your score counts your first choices and stays in this browser only.
Lumo: ready for the next step? Take your time: you can come back to this page whenever you need it.
Lumo: nicely done! One more page on your journey.